Home > Showcase > Toll Systems > India > Durg Bypass

Showcase

DURG BYPASS

Project Name: Durg Bypass 6 Lane iTOLL
IRD Contract #: 10341
Client Name: SMSL Shivnath Infrastructure Limited
End User: NHAI BOT
Contract Value: $72,450.00 USD
Date of Award: April 2004
Date of Completion: April 2005
Location: Outside the city of Durg in the state of Chattisgarh, India.

Project Description:IRD supplied six (6) lanes of iTOLL collection equipment. Each lane is a post classification toll auditing system, including an LIU, a loop and Dynax sensor array, a video capture camera, lane software, and basic surge protection equipment. The customer supplied their own lane computers, printer, UPS’s, Camera mounting equipment, AC power, and a plaza computer. IRD provided installation services to install the iTOLL equipment and CAT 5 network.

Previous | Table of Contents | Next

International Road Dynamics Inc.

About IRD PAT