Showcase
HRBC iTOLL WITH ETC
Project Name: HRBC iTOLL with ETC l
IRD Contract #: 10605
Client Name: Shaktikumar M. Sancheti Ltd.
End User: Hooghly River Bridge Commission
Contract Value: $1.1 Million USD
Date of Award: November 2005
Date of Completion: November 2006
Location: Kolkata, West Bengal
Project Description: The purpose of the project is to supply, install, and commission 24 lanes of iTOLL collection equipment. Out of these 24 sets of lane equipment,
- 12 will be installed as mixed mode unidirectional lanes (one set of equipment per lane) that can accept cash and pre-paid smart cards for payment.
- Remaining 12 lanes of equipment shall be installed in six (6) traffic lanes (two (2) sets of lane equipment per traffic lane) and shall function as mixed mode reversible lanes. All the standard lane equipment in the reversible lanes will be the same as in unidirectional lanes.
- Out of the 12 unidirectional lanes, two (2) lanes on each direction of traffic shall be dedicated unmanned gated ETC lanes.
