Projects

Hong Kong Stonecutters Bridge

Project Description:

The Stonecutters Bridge is the second longest cable-stayed bridge in the world, with a center span of 1,018 meters.  It has been featured on the Discovery Channel's Extreme Engineering Series.

The WIM equipment for the project consists of 48 PAT Weighpads and 48 Loop Sensors, attached to iSINC electronics with the new W3 card.  This equipment is installed across four sites on the bridge, each of which is around 80 meters above the ground.

Back to Projects
Request Info

Clarion Events can trace its roots back to 1947 and takes great pride in being one of the oldest independent event organizers in the UK. More recently the firm has developed an international portfolio of brands and now has interests in a number of global vertical industries.
Learn More >

IRD is proud to be a Silver Sponsor of Truckers Against Trafficking, an organization that exists to educate, equip, empower and mobilize members of the trucking and travel plaza industry to combat domestic sex trafficking.
Learn More >

Request Info