Projects

Shenzhen Western Corridor Bridge

Project Description:

IRD designed, manufactured, supplied, tested and commissioned two (2) complete sets of dynamic WIM (weigh-in-motion) systems. Each set included three lanes of double threshold PAT bending plate with two loops per lane. The sensors are terminated to DAW 100 WIM electronics housed in weather proof, roadside cabinets.

The WIMs were integrated with the Fugro data acquisition system. IRD provided Fugro with the DAW 100 interface and supported Fugro, on a technical level, with the integration. The IRD software was written to accommodate a double threshold bending plate configuration.

These systems are located on the Shenzhen Western Corridor Bridge connecting Hong Kong to the mainland.

Back to Projects
Request Info

CANSEC 2018 will be held May 30-31, 2018 in Ottawa, Ontario, Canada. CANSEC will showcase leading-edge technology for the Defence and Security Industries.
Learn More >

IRD is proud to be a Silver Sponsor of Truckers Against Trafficking, an organization that exists to educate, equip, empower and mobilize members of the trucking and travel plaza industry to combat domestic sex trafficking.
Learn More >

Request Info